Admin message

** Notice: all internal pipelines have been restricted to 30 minute timeouts, if your CI/CD runs take longer, either use your own runners or read below **

We would remind everyone that the CI/CD services provided by the university Gitlab servers are intended for CI/CD use only (ie. delivering new versions of your software to your production servers, etc).They are not intended for data analysis or -production use, or creating, building and running servers to do heavy data calculation or visualization.

As a general guideline; if your jobs take more than 15 minutes, you might be running something that is better suited for a dedicated system or a virtual server - in this case, please contact the helpdesk for a solution to your needs.

Closed
Milestone May 9, 2019–May 28, 2019

M1 - One way viewing test

Stream the 3D scene in real-time to a location elsewhere on the UTU campus as part of a co-design activity with a number of different user groups to help them form design ideas for the interfaces to the system. The scene must be a typical lab space with at least 3 people in it who are moving around.

This milestone requires:

  • merging and registration of point clouds from at least 3 camera pairs
  • some compression of the scene for streaming
  • a reliable network connection
  • some interface to view and interact with the scene

Desirable features:

  • ability to record the scene for test data and evaluation
  • Work items 6
  • Merge requests 0
  • Participants 2
  • Labels 6
Loading
Loading
Loading
Loading
100% complete
100%
Start date
May 9, 2019
May 9
-
May 28 2019
Due date
May 28, 2019 (Past due)
6
Work items 6 New issue
Open: 0 Closed: 6
None
Total weight
None
0
Merge requests 0
Open: 0 Closed: 0 Merged: 0
0
Releases
None
Reference: nicolaspope/ftl%"M1 - One way viewing test"